Cable Stayed Bridge With Full Climbing Rope In Shenzhen Project
Date: | Read: 258
This full climbing net was completed by CREEZ in 2020. The climbing structure is divided into a flat area and a slope area at a height of 6 meters above the ground. CREEZ made the climbing net in the middle of the site according to the radiation line of the bridge deck. This project was processed and constructed on site, and experienced various weather conditions. As it is a state-owned enterprise project, the manager Teddy chan guided the project to ensure completion.